New neighborhood sharrows

Our big weekend left me worn out so today’s ride for 30 Days of Biking was a short one–just to the doctor for the newly five-year old’s annual checkup. I love that the building has a bike rack right by the door, but even a normal-sized bike would block the walkway from one of the two small parking lots if inserted straight in a slot so I parked sideways at one end.

On our way home we saw four new sharrows where 43rd crosses Stone Way, part of the new Neighborhood Greenways network. Yippee!

Today’s miles: 2.5 miles
April cumulative: 180.7 miles

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s